Prerequisites of Burner
1. Must have groundwork, Incineration, Scrubber measures to melt waste entirely and waste gas have to be non-polluted
2. Strong steel, heat resistant coating, stainless steel cover, painted tubular steel frame, 2-blowers, axial vane, appropriate drum (S/S, thick) for the burner should be provided.
3. Approximate. 20 to 25 Kg per set and the time needed for 1 set not more than 1 hour usually. Ash should be only 5% of the waste material
5. 220V Air Conditioning
7. Surgical, clinical & laboratory waste
8. B X L X H = 4 feet X 8 feet X 6 feet
9. 1 year service warranty
10. ISO Licensed
11. Mobile Burner
12. Electric
health center waste administration group at a tertiary care health center,1250 beeded hsopital.
our regular waste generated from all resources is 0.55 kg/bed/day =685kg/day
we need an incinerator of 150kg/hour filling capability.
plz answer with, purchasing, installment, running along with upkeep cost.incinerators, especially, medical was burners
11. Mobile Burner
12. Electric