* A button circuit breaker for each engine (ventilators and also heaters).
* An additional injection of air to create sure excellent oxygen content.
22.
25. The technical training of drivers will have to be offered and also given by a professional from
This Item and also tools should include in the drop of the burner: base in rubble stone, seclusion roofing versus humudity; altitude with brick of 20 cm (bloc cement), moving lintel (linteau) in enhanced concrete; steel frame (charpente en steel); roof covering in sheet B.C.A. 28 BG (Toiture en t?le), steel rain gutter, sanitary installation (laundry basin, soakway pit of 20 m of deepness); ash pit of 30 m3, electrical setup; concrete bit for Managing the burner; chanel for evacuation of rain water or waste water, cord mesh for oygenation up the lintel; smooth rougtcasting of walls (inside and outside); plinth with cement; two metal doors; email paints indoors and additionally latex paints outside your home on walls and on doors; roof limit (planche de rive); measures for this spec will certainly depend upon the dimension of the incinerator that will identify the size of the drop of the incinerator., etc
21. The de- ashing needs to be carried out in the bottom of the combustion chamber or the deashing need to be Automatic or manual set de ashing.
* Electro-ventilator dispersing the secondary air, the regulation of the air circulation being accomplished by shutoffs and adhering to the control of the automatic cycle.
19. A control box guaranteeing the total cycle of burning.
20. Fan:
The manufacturing facility; it will contain medicinal and also preventative upkeep, and utilizing machine, etc
NB.: Civil works and any kind of other relevant services for the setup and also training of operators need to be consisted of at the burner’s cost.
* A regulatory authority with digital watching for the temperature of postcombustion.
Specification for the shelter of the incinerator: House of the incinerator comprehensive in offer (your house must have facilities for hand cleaning and also firefighting).
* A timer with flexible temporization for the law of each heater.
24. The supplier will perforn an onsite installment of the burner.
* Burner with gasoline, mono-bloc casting assisting kind with straight fire, lights and security and security of digital ignition, permanent ventilation, electro-magnetic sluice gate of policy and separating shutoff.
23. The setup burner should bear a 1 year assurance.
22. The provider has to give sets of extra components of first seriousness as well as consumable of the incinerator.
* A regulatory authority with digital watching for the temperature level of combustion.