SECTION V TECHNICAL SPECIFICATIONS OF THE INCINERATOR General Description The plant have to have four different sections that show three fundamentals of disturbance, home time and temperature retention. The controlled areas may include but not limited to: Overall plant layout Feed chamber/charging Primary combustion chamber Particulate scrubbers Acid gas The stack/chimney. Minimum capacity of primary […]
TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 medical facilities INTRO All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal […]
Burning rate: 250 Kg/hr. It should be able to Operate not Less than 10 hours/day This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc… Design Specification: Types A, B, C, D, and E of medical waste “PYROLYTIC” combustion, by controlling the gasification of waste. The incinerator […]
Heap: TIMBER PALLETS. – ABIDES BY EURO/ OR US-EPA EXHAUST SPECIFICATIONS – OPERABLE BY 1 INDIVIDUAL, WITHOUT ANY TRAINING REQUIRED – GAS SCRUBBING SYSTEM – COMPUTERIZED ASH REMOVAL SYSTEM – 95% REDUCTION OF SOLID WASTE Type: Cord Supported – AUTOMATIC LOADING SYSTEM Elevation:3 Meters or even more – PROCESS AT THE VERY LEAST 1 METRIC […]
Major components are– Ethanol, Paraffin, Silicon, Aluminium chloro hydrate, Bentone, LPG quote for incinerators for Industrial chemical wastes therapy, 1 burning rate have to be Regular 30kgs/h 5 interior temperature level first should be 1000c as well as second need to be 1200c 6 pipeline length should be 20 M Our needs are for 125 […]
Capability: 20KG/Hr, Temp Variety: 600 Deg. Gas Supply: Natural Gas/Diesel Dual Burning Chamber Complete Scrubbing System (Dual Resultant Gas Washing Machine), Dual Blower, Chimney Elevation: 8m Electric Supply: 220/240Volt, Single Stage
30 August 2013 Last upgraded at 21:18 BST Five councils in south eastern Wales have made a collaboration to take care of black bag waste in an attempt to reduce rubbish going to landfill. The government aim to blaze waste which can’t be recycled and convert it into power in a new task which is […]
Biomedical Waste Any kind of powerful or liquid waste which may offer a hazard of infection to people composed of non-liquid tissue, body parts, blood or blood things and body fluids, research lab and also veterinary waste which includes human disease- triggering agents, and discarded sharps (i.e. syringes, needles, scalpel blades). Base Ash The program […]
Incinerator Of Burning Capacity 30 kg/hr = 1 No The Incineration System Includes: I. Main Burner with A. Refractory lined Key and Additional Chamber. VI. Emergency position stack/ vent. VII. Cyclonic type droplet separator orgasm recirculation container in Mild steel ii. 1 No. Fully automated oil burner for additional chamber. III.Centrifugal forced draft combustion air […]
Burning Capability: 125 kg minimum/time (3-6times/ day), dual chamber, dual combustion system Per your advertisement for 300 kg.hr. Version– We need to know the rate through return. The amount of Kg. Of petrol would be required for running this Layout 10 hrs. day-to-day. We’ve got our own Freight Forwarding Agent. We had a Contract for […]
Heat Waste Incinerator Design D. MEGABYTES 750XL Melt Rate-150Kg/ hr minimal Weight( Kg) -4000 kg Added Chamber (double chamber with post-burning) Gas Retention Time 2 2nd Gas Diesel Power Supply for control box 220V-240, single stage 50-60Hz Minimum working temperature level 1200 oC 1 year spare parts bundle for total maintainability 10m pipe pipeline. 1100 […]

