Gasified incineration for melting medical wastes incinerator

Gasified incineration for burning clinical wastes.

Gas kind: Natural Gas
–– 30-50 kg/time
Temperature Monitoring: Both for primary and secondary chambers.
–– Daily 3-6 times

Burner size: max 2000x1200x3200 mm
Charging price:.
Burning room volume:
Capacity (Cubic Mtr): 1.65 M3 or more.
Waste destruction efficiency:> 90% by weight.
–– Gasification space max 0.7 m3,
– Waste collection Trolleys.
–– Additional burning area max 0.5 m3 ,

Dimension of the filling up entry: max 650×× 850 mm Air blower: max 0,5 kW Combustion-support burning devices: – Power max 0,2 kW INCINERATOR (WASTE BURNER).
Filter: Ceramic or various other equal filters in order to lower the induction of unsafe air pollutants, particulates, carbon monoxide, dioxin/furane into the environment.
– Civil functions.
– Main as well as secondary chamber temperature introduced and listed (optional).
– As much as 100kgs per hour of waste or red bag waste rated at 2200 BTU’s per kg.
– Pipes.
– Vertical cost door on key chamber.
Ash Door Opening (mm): 475×× 900 or much better.
Twin chamber combustion, Chambers insulated and also lined with high temperature refractory. Programmable digital temperature controls, temperature signals and also cost recorder. Modulating control for gas as well as air decreases gas consumption.
Height Incl. Flue (mm): 7700 or far better.
Max, Operating Temperature: 1350 degree centigrade.
Ave Ability: 100kg per hr.
Burning Capacity:
Re-burning machine: Power max 0,2 kW Voltage: 220V/ 380V.
Filling SystemManual/semi-automatic.
Additional Chamber Capacity (CubicMtr):3.88 or more.
Width (mm): 1280 or better.
– Pneumatic or hydraulic ram charging system.
Residency time in Second Chamber: 2 sec.
Minimum installment and also launch time.
Weight: max 5000 kg

Categories: